| Date - Field | BosniaandHerzegovina - Railways |
2008 January Railways | total: 608 km standard gauge: 608 km 1.435-m gauge (2006) |
2007 January Railways | total: 608 km (777 km electrified) standard gauge: 608 km 1.435-m gauge (2005) |
2006 January Railways | total: 1,021 km (795 km electrified) standard gauge: 1,021 km 1.435-m gauge (2003) |
2005 January Railways | total: 1,021 km (795 km electrified) standard gauge: 1,021 km 1.435-m gauge (2003) |
2004 January Railways | total: 1,021 km (795 km electrified) standard gauge: 1,021 km 1.435-m gauge (2003) |
2003 January Railways | total: 1,021 km (795 km electrified) standard gauge: 1,021 km 1.435-m gauge (2002) |
2002 January Railways | total: 1,021 km (795 km electrified; operating as diesel or steam until grids are repaired) standard gauge: 1,021 km 1.435-m gauge; note - many segments still need repair and/or reconstruction because of war damage (2000 est.) |
2001 January Railways | total: 1,021 km (electrified 795 km; operating as diesel or steam until grids are repaired)
standard gauge: 1,021 km 1.435-m gauge; note - many segments still need repair and/or reconstruction (2000) |
2000 January Railways | total:1,021 km (electrified 795 km; operating as diesel or steam until grids are repaired) standard gauge:1,021 km 1.435-m gauge (1995); note - some segments still need repair and/or reconstruction |