| Date - Field | Japan - Railways |
2012 January Railways | total: 26,435 km standard gauge: 3,978 km 1.435-m gauge (3,978 km electrified) narrow gauge: 96 km 1.372-m gauge (96 km electrified); 22,313 km 1.067-m gauge (15,235 km electrified); 48 km 0.762-m gauge (48 km electrified) (2009) |
2011 January Railways | total: 26,435 km standard gauge: 3,978 km 1.435-m gauge (3,978 km electrified) narrow gauge: 96 km 1.372-m gauge (96 km electrified); 22,313 km 1.067-m gauge (15,235 km electrified); 48 km 0.762-m gauge (48 km electrified) (2009) |
2010 January Railways | total: 23,506 km standard gauge: 3,437 km 1.435-m gauge (3,319 km electrified) narrow gauge: 20,059 km 1.067-m gauge (11,842 km electrified); 11 km 0.762-m gauge (11 km electrified) (2008) |
2009 January Railways | total: 23,474 km standard gauge: 3,204 km 1.435-m gauge (3,204 km electrified) narrow gauge: 77 km 1.372-m gauge (77 km electrified); 20,182 km 1.067-m gauge (13,334 km electrified); 11 km 0.762-m gauge (11 km electrified) (2006) |
2008 January Railways | total: 23,474 km standard gauge: 3,204 km 1.435-m gauge (3,204 km electrified) narrow gauge: 77 km 1.372-m gauge (77 km electrified); 20,182 km 1.067-m gauge (13,334 km electrified); 11 km 0.762-m gauge (11 km electrified) (2006) |
2007 January Railways | total: 23,556 km standard gauge: 3,204 km 1.435-m gauge (3,204 km electrified) narrow gauge: 77 km 1.372-m gauge (77 km electrified); 20,264 km 1.067-m gauge (13,280 km electrified); 11 km 0.762-m gauge (11 km electrified) (2005) |
2006 January Railways | total: 23,705 km (16,519 km electrified) standard gauge: 3,204 km 1.435-m gauge (3,204 km electrified) narrow gauge: 77 km 1.372-m gauge (77 km electrified); 20,393 km 1.067-m gauge (13,227 km electrified); 31 km 0.762-m gauge (11 km electrified) (2003) |
2005 January Railways | total: 23,705 km (16,519 km electrified) standard gauge: 3,204 km 1.435-m gauge (3,204 km electrified) narrow gauge: 77 km 1.372-m gauge (77 km electrified); 20,393 km 1.067-m gauge (13,227 km electrified); 31 km 0.762-m gauge (11 km electrified) (2003) |
2004 January Railways | total: 23,167 km (15,995 km electrified) standard gauge: 3,204 km 1.435-m gauge (3,204 km electrified) narrow gauge: 77 km 1.372-m gauge (77 km electrified); 19,855 km 1.067-m gauge (12,683 km electrified); 31 km 0.762-m gauge (31 km electrified) (2002) |
2003 January Railways | total: 23,168 km (15,995 km electrified) standard gauge: 3,204 km 1.435-m gauge (3,204 km electrified) narrow gauge: 77 km 1.372-m gauge (77 km electrified); 19,855 km 1.067-m gauge (12,683 km electrified); 31 km 0.762-m gauge (31 km electrified) (2002) |
2002 January Railways | total: 23,654 km (15,895 km electrified) standard gauge: 3,059 km 1.435-m gauge (entirely electrified) narrow gauge: 77 km 1.372-m gauge (entirely electrified); 20,491 km 1.067-m gauge (12,732 km electrified); 27 km 0.762-m gauge (entirely electrified) (2000) |
2001 January Railways | total: 23,670.7 km
standard gauge: 2,893.1 km 1.435-m gauge (entirely electrified)
narrow gauge: 89.8 km 1.372-m gauge (89.8 km electrified); 20,656.8 km 1.067-m gauge (10,383.6 km electrified); 31 km 0.762-m gauge (3.6 km electrified) (1994) |
2000 January Railways | total:23,670.7 km standard gauge:2,893.1 km 1.435-m gauge (entirely electrified) narrow gauge:89.8 km 1.372-m gauge (89.8 km electrified); 20,656.8 km 1.067-m gauge (10,383.6 km electrified); 31 km 0.762-m gauge (3.6 km electrified) (1994) |
|
|
|
This page was last updated on 6 February, 2012 |
|
|