| Date - Field | Liberia - Highways |
2009 January Highways | void - (all current Transportation informations) |
2008 January Highways | void - (all current Transportation informations) |
2007 January Highways | void - (all current Transportation informations) |
2006 January Highways | total: 10,600 km paved: 657 km unpaved: 9,943 km (1999 est.) |
2005 January Highways | total: 10,600 km paved: 657 km unpaved: 9,943 km (1999 est.) |
2004 January Highways | total: 10,600 km paved: 657 km unpaved: 9,943 km (1999 est.) |
2003 January Highways | total: 10,600 km paved: 657 km unpaved: 9,943 km note: there is major deterioration on all highways due to heavy rains and lack of maintenance (1996 est.) |
2002 January Highways | total: 10,600 km paved: 657 km unpaved: 9,943 km note: there is major deterioration on all highways due to heavy rains and lack of maintenance (1996 est.) |
2001 January Highways | total: 10,600 km
paved: 657 km
unpaved: 9,943 km
note: (there is major deterioration on all highways due to heavy rains and lack of maintenance) (1996 est.) |
2000 January Highways | total:10,600 km (there is major deterioration on all highways due to heavy rains and lack of maintenance) paved:657 km unpaved:9,943 km (1996 est.) |
|
Ing.Gianfranco Magrini Science, Engineering, Transportation, Tunnels, Presenta il progetto: Il Tubo del Lago di Como www.edixxon.com/magrini |
Isella Enrico e Figli Srl Accessories for suspended ceilings Metal Parts Deep drawing www.isellasrl.it |
Mascherpa Distributore esclusivo di macchine, utensili, componenti, attrezzature, lubrificanti speciali, adesivi-sigillanti, anticorrosivi www.mascherpa.it |
| |
|
|
This page was last updated on 23 June, 2009 |
|
|