| Date - Field | Netherlands - Railways |
2009 January Railways | total: 2,801 km standard gauge: 2,801 km 1.435-m gauge (2,064 km electrified) (2007) |
2008 January Railways | total: 2,811 km standard gauge: 2,811 km 1.435-m gauge (2,064 km electrified) (2006) |
2007 January Railways | total: 2,808 km standard gauge: 2,808 km 1.435-m gauge (2,061 km electrified) (2005) |
2006 January Railways | total: 2,808 km standard gauge: 2,808 km 1.435-m gauge (2,061 km electrified) (2003) |
2005 January Railways | total: 2,808 km standard gauge: 2,808 km 1.435-m gauge (2,061 km electrified) (2003) |
2004 January Railways | total: 2,808 km standard gauge: 2,808 km 1.435-m gauge (2,061 km electrified) (2002) |
2003 January Railways | total: 2,808 km standard gauge: 2,808 km 1.435-m gauge (2,061 km electrified) (2002) |
2002 January Railways | total: 2,808 km standard gauge: 2,808 km 1.435-m gauge (2,061 km electrified) (2001) |
2001 January Railways | total: 2,739 km
standard gauge: 2,739 km 1.435-m gauge; (1,991 km electrified) (1998) |
2000 January Railways | total:2,739 km standard gauge:2,739 km 1.435-m gauge; (1,991 km electrified) (1998) |