| Date - Field | Poland - Railways |
2008 January Railways | total: 23,072 km broad gauge: 629 km 1.524-m gauge standard gauge: 22,443 km 1.435-m gauge (20,555 km operational; 11,910 km electrified) (2006) |
2007 January Railways | total: 23,072 km broad gauge: 629 km 1.524-m gauge standard gauge: 22,443 km 1.435-m gauge (20,555 km operational; 11,910 km electrified) (2005) |
2006 January Railways | total: 23,852 km broad gauge: 629 km 1.524-m gauge standard gauge: 23,223 km 1.435-m gauge (11,962 km electrified) (2003) |
2005 January Railways | total: 23,852 km broad gauge: 629 km 1.524-m gauge standard gauge: 23,223 km 1.435-m gauge (11,962 km electrified) (2003) |
2004 January Railways | total: 23,420 km broad gauge: 646 km 1.524-m gauge standard gauge: 21,639 km 1.435-m gauge (11,626 km electrified) narrow gauge: 1,135 km various gauges including 1.000-m, 0.785-m, 0.750-m, and 0.600-m (2002) |
2003 January Railways | total: 23,420 km broad gauge: 646 km 1.524-m gauge standard gauge: 21,639 km 1.435-m gauge (11,626 km electrified) narrow gauge: 1,135 km various gauges including 1.000-m, 0.785-m, 0.750-m, and 0.600-m (2002) |
2002 January Railways | total: 23,420 km broad gauge: 646 km 1.524-m gauge standard gauge: 21,639 km 1.435-m gauge (11,626 km electrified; 8,978 km double-tracked) narrow gauge: 1,135 km various gauges including 1.000-m, 0.785-m, 0.750-m, and 0.600-m (2001) |
2001 January Railways | total: 23,420 km
broad gauge: 646 km 1.524-m gauge
standard gauge: 21,639 km 1.435-m gauge (11,626 km electrified; 8,978 km double track)
narrow gauge: 1,135 km various gauges including 1.000-m, 0.785-m, 0.750-m, and 0.600-m (1998) |
2000 January Railways | total:23,420 km broad gauge:646 km 1.524-m gauge standard gauge:21,639 km 1.435-m gauge (11,626 km electrified; 8,978 km double track) narrow gauge:1,135 km various gauges including 1.000-m, 0.785-m, 0.750-m, and 0.600-m (1998) |
|
|
|
This page was last updated on 3 September, 2008 |
|
|