| Date - Field | Spain - Railways |
2010 January Railways | total: 15,288 km broad gauge: 11,919 km 1.668-m gauge (6,950 km electrified) standard gauge: 1,392 km 1.435-m gauge (1,054 km electrified) narrow gauge: 1,949 km 1.000-m gauge (815 km electrified); 28 km 0.914-m gauge (28 km electrified) (2008) |
2009 January Railways | total: 14,974 km broad gauge: 11,919 km 1.668-m gauge (6,950 km electrified) standard gauge: 1,099 km 1.435-m gauge (1,054 km electrified) narrow gauge: 1,928 km 1.000-m gauge (815 km electrified); 28 km 0.914-m gauge (28 km electrified) (2006) |
2008 January Railways | total: 14,974 km broad gauge: 11,919 km 1.668-m gauge (6,950 km electrified) standard gauge: 1,099 km 1.435-m gauge (1,054 km electrified) narrow gauge: 1,928 km 1.000-m gauge (815 km electrified); 28 km 0.914-m gauge (28 km electrified) (2006) |
2007 January Railways | total: 14,873 km broad gauge: 11,919 km 1.668-m gauge (6,950 km electrified) standard gauge: 998 km 1.435-m gauge (998 km electrified) narrow gauge: 1,928 km 1.000-m gauge (815 km electrified); 28 km 0.914-m gauge (28 km electrified) (2005) |
2006 January Railways | total: 14,268 km (7,718 km electrified) broad gauge: 11,804 km 1.668-m gauge (6,409 km electrified) standard gauge: 526 km 1.435-m gauge (526 km electrified) narrow gauge: 1,910 km 1.000-m gauge (755 km electrified); 28 km 0.914-m gauge (28 km electrified) (2003) |
2005 January Railways | total: 14,268 km (7,718 km electrified) broad gauge: 11,804 km 1.668-m gauge (6,409 km electrified) standard gauge: 526 km 1.435-m gauge (526 km electrified) narrow gauge: 1,910 km 1.000-m gauge (755 km electrified); 28 km 0.914-m gauge (28 km electrified) (2003) |
2004 January Railways | total: 14,189 km broad gauge: 11,804 km 1.668-m gauge (6,409 km electrified) standard gauge: 455 km 1.435-m gauge (455 km electrified) narrow gauge: 1,902 km 1.000-m gauge (781 km electrified); 28 km 0.914-m gauge (28 km electrified) (2002) |
2003 January Railways | total: 14,189 km broad gauge: 11,804 km 1.668-m gauge (6,409 km electrified) standard gauge: 455 km 1.435-m gauge (455 km electrified) narrow gauge: 1,902 km 1.000-m gauge (781 km electrified); 28 km 0.914-m gauge (28 km electrified) (2002) |
2002 January Railways | total: 15,171 km broad gauge: 12,781 km 1.668-m gauge (6,434 km electrified) standard gauge: 525 km 1.435-m gauge (525 km electrified) narrow gauge: 1,837 km 1.000-m gauge (617 km electrified); 28 km 0.914-m gauge (28 km electrified) (2001) |
2001 January Railways | total: 13,950 km
broad gauge: 12,781 km 1.668-m gauge (6,358 km electrified; 2,295 km double track)
standard gauge: 525 km 1.435-m gauge (525 km electrified)
narrow gauge: 644 km 1.000-m gauge (438 km electrified) (1998) |
2000 January Railways | total:13,950 km broad gauge:12,781 km 1.668-m gauge (6,358 km electrified; 2,295 km double track) standard gauge:525 km 1.435-m gauge (525 km electrified) narrow gauge:644 km 1.000-m gauge (438 km electrified) (1998) |
|
|
|
This page was last updated on 19 July, 2010 |
|
|